久久精品99精品国产香蕉 I 看a级毛片 I www.chengren.com I 一级做a爰片欧美激情床 I 狼人av官网 I 中文字幕日韩av综合精品 I 亚洲国产初高中女 I 一本色道久久综合 I 精品国产一区二区三 I 色婷婷激情小说 I 男女黄床上色视频 I 亚洲国产精彩中文乱码av I 日本深夜网站 I 欧美肥老太牲交 I 精品自拍视频 I 99在线免费观看 I 中文幕av一区二区三区佐山爱 I 嫩草视频在线免费观看 I 亚洲第三区 I 美女给男人捅逼逼 I 国产性色惰视频 I 欧洲美女性生活视频 I 国产矿转码专一2023 I 精品在线视频观看 I 国产成人麻豆精品午夜在线 I 国产成人免费ā片在线观看 I 欧美在线亚洲 I 亚洲国产精品尤物yw在线

Current Location:Home > Product > High frequency induction heating series > High frequency heating machine

2019-10-12 14:03:17

Share
  • Share to WeChat Moments

RAC-65KW high frequency heating machine

  • Description

1. Main application

 1. Application of ribbed induction annealing production line;

 2. Heating and burning through the hot upsetting production line of round steel bar and steel column;

 3. Induction heating of square steel;

 4. The diathermy of the whole iron rod;

 5. Red forging of standard parts (nuts and bolts);

 6. Partial through-fire forging forming of pipes;

 7. Hot forging of cold-drawn solid section steel, hot upsetting of the tie head of cold-drawn seamless steel pipe;

 8. Induction hot upsetting of drill pipe ends;

 9. Heating forging of automobile maintenance tools (socket wrenches);

 10. Heating, stamping and bending of high-voltage power transmission and power line tower angle steel plates;

 11. On-line warm upsetting forging of copper bars;

 12. The application of heating and warm upsetting in the hot upsetting production line of the automatic steel ball and steel column upsetting machine.

 13. Hot forging of rivets, spring bars and road studs for railway accessories

 14. Heating of supporting accessories such as circlips and U-shaped cables;

 15. Heating ears of leaf springs, etc.

 

2. Main Features

1. Using IGBT power devices and our company's second-generation converter control technology, the equipment has higher reliability and lower maintenance costs;

2. Full load continuous rate, 24 hours operation;

3. With constant current/constant power control function, the heating efficiency is higher;

4. Full display of output power, frequency and current;

5. The installation is simple, only need to connect electricity and water to use, no need to install by special personnel;

 

3. Installation method

1. Place the main and auxiliary machines: Generally, the main machine (operation control machine) is placed on the top, and the auxiliary machine (power output machine) is placed at the bottom.

2. Connect the water and electricity of the main and auxiliary machines: Use the two thin water pipes in the accessories to connect the waterway in a straight up and straight down way. Then use the two cables in the accessories, red to red and black to black to connect the circuit. It must be tightened, and there should be no poor contact. Connect the ground wire of the main and auxiliary machines.

3. Power connection: This machine is a three-phase power supply mode (380V), and the three red wires are respectively connected to a special three-phase switch or air switch (above 65A). Reconnect the ground wire.

4. Water connection: The cooling water pressure used by this machine is 0.1Mpa-0.3Mpa. Please choose a 1.1KW water pump and a water tank or pool (the water pump should be selected according to the length of the distance, and the larger water pump should be selected for the long distance; the volume should be selected according to the continuous working time and workload, and a small cooling tower can be installed if necessary). The water outlet of the pump is connected to the water inlet of the machine with a water pipe, and the water outlet of the machine returns the return water to the pool with a water pipe to realize water circulation cooling.

5) Install the induction coil: According to the shape and size of the heated metal workpiece, select, install and fix the induction coil. Note that the induction coil cannot be short-circuited.

6. Putting the workpiece: Put the workpiece to be heated into the center of the induction coil, the surrounding gap should be basically the same, and the workpiece and the induction coil should not touch.

 

4. Operation steps

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!

 

5. Maintenance

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

 

6. Technical parameters


model

RAC-65KW

Output Power

65KW

Input voltage

380v 50hz

Oscillation frequency

10-30khz

Pump Specifications

1.1kw

Cooling tower water flow

10T/Hour

pool

1cube

transformer

50KW

copper wire

25square

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 久久久久成人片免费观看蜜芽 | a级毛片免费观看在线播放 99久久精品免费看国产一区二区 | 欧洲美洲精品一区二区三区 | 亚洲国产成人无码av在线 | 亚洲中文字幕精品久久久久久动漫 | 国内精品久久久久影院一蜜桃 | 特级无码毛片免费视频尤物 | 精品久久久久久无码人妻 | 亚洲线精品一区二区三区 | 日韩少妇内射免费播放18禁裸乳 | 97人妻人人揉人人躁人人 | 98国内自拍在线视频 | 久久亚洲精品中文字幕波多野结衣 | 亚洲日韩在线中文字幕线路2区 | 草草浮力地址线路①屁屁影院 | 日韩~欧美一中文字幕 | 国产精品一品二区三区的使用体验 | 日日噜狠狠噜天天噜av | 中文字幕久精品免费视频 | 国产精华av午夜在线观看 | 老司机午夜精品视频资源 | 国产成人无码国产亚洲 | 粉嫩小泬无遮挡久久久久久 | 少妇夜夜春夜夜爽试看视频 | 激情久久亚洲小说 | 亚洲伊人久久综合网站 | 性色欲网站人妻丰满中文久久不卡 | 久久精品99久久香蕉国产 | 午夜福利国产成人无码gif动图 | 无码午夜人妻一区二区不卡视频 | 日韩人妻无码精品专区 | 国产aⅴ夜夜欢一区二区三区 | 国产伦子伦露脸 | 99久久久精品免费观看国产 | 亚洲中文字幕无码久久 | 中文字幕人妻丝袜成熟乱 | 日本三级香港三级人妇99 | 亚洲人成色在线观看 | 免费观看日本a毛片 | 最新在线精品国自产拍视频 | 久久大香伊蕉在人线国产h 亚洲中文字幕无码av正片 |